HomeOthersPower giant NTPC’s mining arm surpasses 100mn tonnes coal production milestone

Power giant NTPC’s mining arm surpasses 100mn tonnes coal production milestone

Power giant NTPC’s mining arm surpasses 100mn tonnes coal production milestone

New Delhi, Feb 26 (IANS) Government-owned power giant NTPC’s coal-mining subsidiary NTPC Mining Ltd. (NML) has surpassed the milestone of producing 100 million metric tonnes (MMT) of coal.

“The milestone has been achieved on February 25, 2024, on which day the cumulative quantity of coal produced by NTPC Mining Ltd, since January 1, 2017 when coal production started in its first coal mine Pakri Barwadih, reached 100.04 MMT,” according to a Power Ministry statement issued on Monday.

While the NML achieved the first 50 MMT of coal production in 1,995 days on June 19, 2022, the next 50 MMT of coal production has been achieved in less than one-third of this time, which is just 617 days, the statement said.

NML is targeting a coal production of 100 MMT per annum by the year 2030.

At present, NTPC Mining Ltd. has five operational captive coal mines, namely, Pakri Barwadih, Chatti Bariatu and Kerandari Coal Mines in Jharkhand, Dulanga Coal Mine in Odisha and Talaipalli Coal Mine in Chhattisgarh.

To achieve sustained growth in coal production, NTPC has implemented a range of strategies and technologies.

These include the adoption of rigorous safety measures, improved mine planning, equipment automation, workforce training and implementation of continuous monitoring and analysis systems.

–IANS

sps/pgh

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular