New Delhi, March 14 (IANS) Prime Minister Narendra Modi on Thursday laid the foundation stone of two additional corridors of Delhi Metro’s Phase 4.
The new corridors, connecting Inderlok to Indraprastha and Lajpat Nagar to Saket G-Block, will together be more than 20 km long and help improve connectivity and reduce traffic congestion.
“These two additional corridors, connecting Inderlok to Indraprastha and Lajpat Nagar to Saket G Block, are gifts for Delhi people. I congratulate all,” the PM said.
During the event at the Jawaharlal Nehru Stadium, PM Modi also engaged with recipients of the PM SVANidhi scheme.
He expressed gratitude to street vendors, acknowledging their vital role in society, as was especially evident during the challenges of the Covid-19 pandemic.
Union Urban Development Minister Hardeep Singh Puri, who was also present, said that around 945 km of metro rail network is operational across the country.
“Around 65 to 70 lakh people travel in the Delhi Metro daily. These two corridors will be constructed at the cost of Rs 8,400 crore,” he said, adding that around 2.5 lakh people will benefit from this daily.
“I thank PM Modi that you are dedicating the project to the people of Delhi and this is one more step towards PM Modi’s vision for ‘Viksit Bharat’,” Puri said.
The development of these corridors was cleared on Wednesday by the Union Cabinet chaired by the Prime Minister.
The Inderlok-Indraprastha corridor will be an extension of the Green Line and will provide interchange with the Red, Yellow, Airport Line, Magenta, Violet, and Blue Lines, while the Lajpat Nagar-Saket G Block corridor will connect the Silver, Magenta, Pink, and Violet Lines.
The Lajpat Nagar-Saket G Block corridor will be entirely elevated and will have eight stations — Lajpat Nagar, Andrews Ganj, Greater Kailash-1, Chirag Delhi, Pushpa Bhawan, Saket District Centre, Pushp Vihar, and Saket G Block.
The Inderlok-Indraprastha corridor will have 11.35 km of underground lines and 1.03 km of elevated lines and comprise 10 stations — Inderlok, Daya Basti, Sarai Rohilla, Ajmal Khan Park, Nabi Karim, New Delhi, LNJP Hospital, Delhi Gate, Delhi Sachivalaya, and Indraprastha.
It will provide enhanced connectivity to the Bahadurgarh region of Haryana as commuters from these areas can travel on the Green Line to directly reach Indraprastha and various other areas of central and east Delhi.
Eight new interchange stations will come up on these corridors at Inderlok, Nabi Karim, New Delhi, Delhi Gate, Indraprastha, Lajpat Nagar, Chirag Dilli, and Saket G Block, and significantly improve the interconnectivity among all the operational lines of the Delhi Metro network.
The Delhi Metro is already constructing a network of 65 km as part of its fourth phase. These new corridors are expected to be completed, in stages, by March 2026.
Presently, the DMRC operates a network of 391 km consisting of 286 stations. The Delhi Metro is now one of the fastest-growing Metro networks in the world.
–IANS
ssh/vd
Disclaimer
The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
For any legal details or query please visit original source link given with news or click on Go to Source.
Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.
If you are not willing to accept this disclaimer then we recommend reading news post in its original language.