HomeTop StoriesNHAI invites tenders for Telangana's Regional Ring Road

NHAI invites tenders for Telangana’s Regional Ring Road

Hyderabad, Dec 29 (IANS) The National Highways Authority of India (NHAI) has invited tenders for the construction of the northern part of the Regional Ring Road (RRR) in Telangana with a total estimated cost of Rs 5,554.02 crore.

The northern part of the RRR from Sangareddy to Choutuppal will be executed in five packages.

The RRR’s northern part will be 161.518 km long. The deadline for this four-lane, access-controlled greenfield regional expressway is two years.

The NHAI had decided to undertake this project in Engineering, Procurement, and Construction (EPC) mode. The maintenance period of the project will be five years.

The project will be executed in five packages. Package-1 is from Girmapur village at Sangareddy to Reddipalle (34.5 km) and this is estimated to cost Rs 1,529.19 crore.

Package 2 from Reddipalle to Islampur (26 km) will be executed for Rs 1,114.8 crore. Package-3 from Islampur to Pragnapur (23 km) Rs 1,184.81 crore, Package-4 from Pragnapur to Rayagiri (43 km) Rs 1,728.22 crore and Package-5 from Rayagiri village to Tangadpalle village (35 km) Rs 1,547 crore

The last date for submission of the financial and technical bids is February 14. The bids will be opened on February 17.

According to officials, land acquisition for the execution of the project is almost completed. The cost of land acquisition is being borne by the state and the Centre on a 50:50 basis.

The Centre has sanctioned Rs 7,104.06 crore for RRR, which is expected to be a “super game-changer” for Telangana.

Last month, the Detailed Project Report (DPR) was presented to NHAI by the consultancy.

Telangana Roads & Buildings Minister Komatireddy Venkat Reddy has hailed the NHAI calling tenders for the project. He said the day would be written in the state’s history with golden letters.

He recalled that he along with Chief Minister A. Revanth Reddy met Union Minister of Road Transport and Highways Nitin Gadkari several times to request him to expedite the process for launching the project.

The state minister said Outer Ring Road (ORR) was a game-changer for Hyderabad and Telangana while the RRR would be a :super game-changer”.

In June, the Chief Minister had urged Union Minister Gadkari to declare the southern part of the RRR as a national highway.

The southern part is proposed from Choutuppal to Amangal-Shadnagar-Sangareddy to a length of 181.87 km.

–IANS

ms/svn

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular