New Delhi, Feb 23 (IANS) The government has approved amendments to the Electricity (Rights of Consumers) Rules that will further reduce the timeline for getting new electricity connections and simplify the process of setting up rooftop solar installations, Minister for Power and New & Renewable Energy R. K. Singh said on Friday.
The minister said that the amendments empower consumers living in multi-storied flats in choosing their connection type and ensure separate billing for common areas and back-up generators in residential societies, thus enhancing transparency. The amendments also provide for check meters to be installed by distribution company in case of consumer complaints, to verify electricity consumption.
The major amendments made are as follows:
Facilitating easier and faster installation of rooftop solar systems
Amendments have been made in the Rules, to facilitate faster installation and enhance the ease of setting up Rooftop Solar PV systems at the premises of prosumers.
Exemption has been given for the requirement of technical feasibility study, for systems up to a capacity of 10 kW. For systems of capacity higher than 10 kW, the timeline for completing the feasibility study has been reduced from 2o days to 15 days. Further, in case the study is not completed within the stipulated time, the approval will be deemed to have been given.
Additionally, it has now been mandated that the distribution system strengthening necessary for rooftop solar PV systems up to 5 kW capacity will be done by the distribution company at its own cost.
Further, the timeline for the distribution licensee to commission Rooftop Solar PV systems has been reduced from 30 days to 15 days.
Separate connections for electric vehicle charging stations
Consumers can now obtain separate electricity connections for charging their Electric Vehicles (EVs).
This aligns with the country’s goal of reducing carbon emissions and reaching Net Zero by the year 2070.
New connections and change in existing connections to be obtained faster
The time period for obtaining a new electricity connection under the Rules has been reduced from seven days to three days in metropolitan areas, from fifteen days to seven days in other municipal areas, and from thirty days to fifteen days in rural areas. However, in rural areas with hilly terrain, the time period for new connections or for modifications in existing connections will remain thirty days.
Additional rights for consumers
Provisions have been introduced in the Rules, to enhance consumer choice and promote greater transparency in metering and billing.
Owners residing in co-operative group housing societies, multi-storied buildings, residential colonies, etc., will now have the option to choose from the distribution licensee either individual connections for everyone or a single-point connection for the whole premises. The exercise of the option will be based on a transparent ballot to be conducted by the Distribution Company. Parity has also been brought in the tariff charged to consumers who get electricity supplied through single-point connection and to those who avail of individual connections.
Metering, billing, and collection will be done separately for: (i) individual electricity consumption sourced from the distribution licensee, (ii) individual consumption of backup power supplied by the residential association, and (iii) electricity consumption for common areas of such residential associations, which is sourced from the distribution licensee.
Mandatory additional meter in cases of complaints
In cases where consumers raise complaints about meter reading not aligning with their actual electricity consumption, the distribution licensee is now required to install an additional meter within five days from the date of receipt of the complaint. This additional meter will be used to verify the consumption for a minimum period of three months, thus reassuring consumers and ensuring accuracy in billing.
The Power and New & Renewable Energy Minister stated that the interest of consumers is paramount for the government. It is for this purpose that the government issued the Electricity (Rights of Consumers) Rules, 2020 on 31st December, 2020, thus setting standards for services provided by electricity distribution companies all over India. These rules cover aspects such as billing, complaints, compensation and timelines for new connections. They also offer support for renewable energy generation by prosumers. The Power and New & Renewable Energy Minister stated that the present amendments will further empower the consumers.
–IANS
sps/dan
Disclaimer
The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
For any legal details or query please visit original source link given with news or click on Go to Source.
Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.
If you are not willing to accept this disclaimer then we recommend reading news post in its original language.