HomeNationalEknath Shinde asks administration to be on guard at pre-monsoon review meeting

Eknath Shinde asks administration to be on guard at pre-monsoon review meeting

Mumbai, May 28 (IANS) Days after the weather bureau forecast 96-106 per cent rainfall in Maharashtra, Chief Minister Eknath Shinde on Tuesday asked the administration to be on guard to effectively tackle the situation arising out of heavy rains and floods in the state.

Chairing a pre-monsoon review meeting here, CM Shinde insisted that all the government agencies and civic bodies should maintain proper coordination in handling nature’s fury.

The Chief Minister also directed that the number of State Disaster Response Force (SDRF) teams be increased from the present eight, all municipalities should make operational teams along the lines of the Target Disaster Response Force, besides forming department-wise SDRF teams.

These measures along with others are necessary as Mumbai is likely to witness rains from June 10-11, while the rest of Maharashtra will see rains from June 15 onwards.

To avoid flooding of railway tracks causing disruptions in suburban train services, Shinde urged the general managers of Central, Western, and Konkan Railways to be prepared with all possible measures.

Keeping in mind the loss of human lives due to the collapse of an unauthorised hoarding at Ghatkopar in Mumbai earlier this month, Shinde asked the BrihanMumbai Municipal Corporation (BMC) and other civic bodies to immediately remove all the unauthorised billboards in the state and register cases against the violators.

He also said that BMC’s permission will be mandatory for putting up hoardings in areas under the jurisdiction of the Mumbai Metropolitan Region Development Authority and the Railways in Mumbai.

To avoid flash floods due to the discharge of water from the reservoirs due to heavy rains, Shinde asked the administration to coordinate with three neighbouring states — Madhya Pradesh, Telangana, and Karnataka.

He also directed that technical inspection of each dam in the state should be completed by May 31, and the wireless system should be functional at each dam site by May 31.

Also, the power department should take necessary steps to ensure that the electricity supply remains safe and secure during stormy weather.

The danger notification system should be kept on alert, public awareness should be created among the citizens, and manhole covers and girders should be installed on Mumbai roads to avoid any mishap, the Chief Minister said.

–IANS

sj/arm

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular