HomeNationalCentre puts Pune Metro line extension, Gudur-Renigunta 3rd rail line projects on...

Centre puts Pune Metro line extension, Gudur-Renigunta 3rd rail line projects on fast track

New Delhi, June 15 (IANS) The Pune Metro line extension project in Maharashtra and the Gudur-Renigunta third railway line in Andhra Pradesh were taken up for discussion at a high-level inter-ministerial meeting to maximise the regional benefits of the projects, the Commerce and Industry Ministry said on Saturday.

The projects which have been put on the fast-track for development were evaluated for their alignment with the PM GatiShakti National Master Plan (NMP) this week.

The Rs 3,757 crore project to extend the operational metro corridor from Vanaz to Ramwadi in Pune is being implemented by the Ministry of Housing and Urban Affairs. The project involves the extension of two lines on the eastern and western ends of the Vanaz–Ramwadi metro corridor. The extension on the western side is an elevated section of 1.12 km from Vanaz to Chandani Chowk, while the extension on the eastern side is an elevated section of 11.63 km from Ramwadi to Wagholi/Vitthalwadi. The total length of this elevated metro corridor will be 12.75 km.

The daily ridership for the line is anticipated to reach 3.59 lakh by 2027, and it is projected to grow to 9.93 lakh by 2057. This extension will connect central Pune with rapidly growing suburbs, reducing travel time and road congestion.

The construction of a third rail line between Gudur and Renigunta stations in Andhra Pradesh’s Tirupati district involves an 83.17 km line, aimed at enhancing the capacity of the existing double line, is being implemented by the Ministry of Railways.

With an estimated cost of Rs 884 crore, this project will improve passenger and cargo movement efficiency, requiring 36.58 hectares of land. Infrastructure upgrades will include new bridges, extended underpasses, and advanced signalling systems, significantly boosting regional economic activities, according to the official statement.

–IANS

sps/kvd

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular