New Delhi, Aug 2 (IANS) The volume of cargo transported through India’s inland waterways has taken a more than 6-fold leap from 18.07 million metric tonnes (MMT) in 2013-14 to 133.03 MMT in 2023-24, Union Minister of Ports, Shipping and Waterways Sarbananda Sonowal told the Lok Sabha on Friday.
From FY 2014-15, the country’s waterways traffic has been surging at an impressive Compound Annual Growth Rate (CAGR) of 18.07 per cent, the Union Minister said.
The minister pointed out that as many as 106 new National Waterways were declared in 2016, with the number of operational waterways increasing from just 3 in 2013-14 to 26 by 2024.
In response to queries about the development of new waterways, Sarbananda Sonowal stated that 14 new National Waterways (NWs) have been approved for development. These waterways, located in Kerala, Goa, Maharashtra, Uttar Pradesh, Bihar, West Bengal, and Assam, are being developed at an estimated cost of Rs 400 crore.
With the ambitious targets set under the Maritime India Vision 2030 and Maritime Amrit Kaal Vision 2047, the Central government aims to further boost cargo traffic, targeting 200 MMT by 2030 and an impressive 500 MMT by 2047, he added.
Sarbananda Sonowal said that Prime Minister Narendra Modi’s focus on holistic development, and his mantra of ‘Transformation through Transportation’, are turning waterways into the new highways of India.
The last decade has seen tremendous improvements in this sector, which is both affordable and eco-friendly. MoPSW is committed to further developing and modernizing the over 14,500 km inland waterways, in alignment with the Maritime Amrit Kaal Vision 2047.
Among the significant measures taken by the government to enhance cargo movement through waterways is the introduction of the Inland Vessels Act, 2021. It stands out as a key legislative reform, replacing a century-old law.
This modern regulatory framework has facilitated seamless transportation, trade, and ease of doing business in the inland waterways sector, the Union Minister said.
The Jal Marg Vikas Project (JMVP), launched in 2018, aims to augment the capacity of NW1 (Ganga – Bhagirathi – Hooghly river system) from Haldia to Varanasi, covering a total length of 1,390 km. This project is being implemented with a financial outlay of Rs 5,369.18 crore. Additionally, the government approved the development of 13 new NWs in 2022.
The opening of the Indo-Bangladesh Protocol Route has further boosted cargo movement by linking NW 1 and NW 2 (Brahmaputra river), thereby enhancing trade and commerce in the Northeast. Significant projects are also underway on NW 2 and NW 16 (Barak river), promising to further boost cargo movement in the North East and along the Indo-Bangladesh Protocol Route.
Digital initiatives are playing a pivotal role in increasing cargo movement on waterways. Innovations such as the IWAI Vessel Tracker and the PANI Portal provide real-time tracking and navigation information, while the CAR-D portal streamlines cargo and passenger data management, Sarbananda Sonowal added.
–IANS
sps/pgh
Disclaimer
The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
For any legal details or query please visit original source link given with news or click on Go to Source.
Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.
If you are not willing to accept this disclaimer then we recommend reading news post in its original language.