HomeTop StoriesAmarnath Yatra temporarily halted due to heavy rain

Amarnath Yatra temporarily halted due to heavy rain

Srinagar, July 6 (IANS) The movement of Amarnath pilgrims towards the cave shrine was temporarily halted on Saturday from both north and south Kashmir base camps due to heavy rain in the area.

Officials said that the movement of Yatris from north Kashmir’s Baltal base camp and from south Kashmir’s Nunwan (Pahalgam) base camp has been temporarily halted due to heavy rain along the twin routes.

Yatris from Baltal base camp have to cover a 14 km-long track to the cave shrine on foot or on ponies, while those using the traditional Nunwan (Pahalgam) base camp have to cover 48 kms which takes four days (one way).

The Pahalgam-cave shrine axis involves Pahalgam to Chandanwari (24 kms), Chandanwari to Sheshnag (13 kms), Sheshnag to Panchtarni (5 kms) and Panchtarni to Cave Shrine (6 kms).

Those taking the 14 km-long Baltal base camp route return the same day to the base camp after ‘Darshan’ inside the cave shrine.

–IANS

sq/kvd

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular