Ahmedabad, July 24 (IANS) Adani Green Energy Limited (AGEL) on Wednesday said it has operationalised the first 250 MW wind capacity at the world’s largest 30,000 MW (30 GW) renewable energy plant at Khavda, Gujarat.
With this milestone, 2,250 MW of cumulative capacity has been made operational at the Khavda plant, strengthening AGEL’s leadership in India with the largest operational portfolio of 11,184 MW.
“Khavda has one of the best wind resources in India, with speeds of 8 metres per second making it an ideal location to harness wind energy. The Khavda Renewable Energy plant is equipped with one of the world’s largest and most powerful onshore wind turbine generators (WTG) of 5.2 MW capacity each,” according to India’s largest renewable energy (RE) company.
The 5.2 MW turbine features a rotor diameter of 160 metres and a tip height of 200 metres, equivalent to the Statue of Unity, the world’s tallest located in Gujarat.
The 5.2 MW WTGs installed at Khavda are built with superior German technology and manufactured at Adani New Industries Limited’s (ANIL) integrated manufacturing ecosystem strategically located near the Mundra port.
AGEL has transformed the Khavda barren wasteland into a hub of clean and affordable energy. The energy from the Khavda RE plant can power 16.1 million homes each year.
The world’s largest renewable energy plant at Khavda, stands a beacon of accelerating the global decarbonisation efforts and India’s sustainable progress.
On Tuesday, Bhutan King Jigme Khesar Namgyel Wangchuck and Prime Minister Dasho Tshering Tobgay visited the world’s largest RE site at Khavda in Gujarat.
Gautam Adani, Chairman of the Adani Group, said he was immensely grateful to them for visiting the Khavda RE plant and Mundra Port.
The commissioning of the first 2 GW at the world’s largest renewable energy plant in Khavda within 12 months of breaking ground has set a record.
Given renewable energy’s growth potential, Adani Green Energy has revised its FY 2029-30 target from 45 GW to 50 GW.
In the fiscal FY24, it added 2.8 GW, 15 per cent of India’s total renewable capacity addition.
–IANS
na/uk
Disclaimer
The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.
In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.
Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.
Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.
For any legal details or query please visit original source link given with news or click on Go to Source.
Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.
If you are not willing to accept this disclaimer then we recommend reading news post in its original language.