HomeNationalTelangana: 22 crest gates of Nagarjuna Sagar opened to release floodwater

Telangana: 22 crest gates of Nagarjuna Sagar opened to release floodwater

Hyderabad, Aug 6 (IANS) With heavy inflows continuing from upstream, 12 more crest gates of the Nagarjuna Sagar Project (NSP) across Krishna River in Telangana were lifted to release water downstream.

The irrigation department officials decided to open more gates as the water level almost touched Full Reservoir Level (FRL) following heavy inflows from the Srisailam project and other areas upstream.

Nalgonda district Collector Narayan Reddy and Nagarjuna Sagar Project (NSP) chief engineer Nageswara Rao initially opened three gates on Monday. As the inflows increased, seven more gates were lifted later.

With the inflows reaching 3.55 lakh cusecs on Monday night, the officials opened more gates. A total of 22 gates have been lifted up to five feet to release the water downstream.

As many as 1.96 lakh cusecs water is being released for power generation and for left and right canals, officials said on Tuesday.

The inflow into NSP on Tuesday was 3.54 lakh cusecs while the outflow was 3.14 lakh cusecs. The present water level in the reservoir is 585.40 feet while the full reservoir level is 590 feet.

The NSP has storage of 298.58 TMC against its full capacity of 312.5 TMC.

The gates of NSP, one of the major dams in the country, have been opened after a gap of two years.

Heavy rains in the catchment area and the massive inflows from upstream, brought to an end a year-long crop holiday and water scarcity in NSP’s vast ayacut comprising 18 lakh acres in both Telangana and Andhra Pradesh.

Before lifting the crest gates, the officials in coordination with the district administration sounded an alert to those residing in the areas downstream and advised them to exercise more caution before entering the river.

Villages along the river in Nalgonda district of Telangana and Palnadu district of Andhra Pradesh were already put on alert and fishermen were advised not to venture into the river.

Meanwhile, the Pulichthe Intala project downstream is also receiving huge inflows following the lifting of the gates of NSP. The water level in the project located in Andhra Pradesh has reached 142.71 feet against an FRL of 175 feet.

The inflow into the project was 74,443 cusecs while the outflow was 25,676 cusecs. The storage in Pulichintala stands at 10.65 TMC against its full capacity of 45.77 TMC.

Meanwhile, the Sriram Sagar project across the Godavari River in Telangana’s Nizamabad district is also receiving huge inflows from upstream.

The water level in the project on Tuesday afternoon was 1080.30 feet against an FRL of 1,091 feet. While the total capacity of Sriram Sagar is 80.5 TMC total, the water storage on Tuesday was 45.75 TMC.

–IANS

ms/dan

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular