New Delhi, Feb 24 (IANS) The BJP-led Delhi government is preparing to present 14 pending Comptroller and Auditor General of India (CAG) reports on the performance of the previous AAP government in the Delhi Assembly on Tuesday (February 25).

A key CAG finding reportedly raised serious concerns over the renovation of former Chief Minister Arvind Kejriwal’s official residence at 6 Flag Staff Road, which the BJP named ‘Sheesh Mahal’. The project, initially sanctioned at a cost of Rs 7.61 crore in 2020, saw its cost escalate to Rs 33.66 crore by April 2022, reflecting a staggering 342 per cent increase, according to sources.

The CAG’s audit reportedly highlights multiple irregularities in both the planning and execution of the renovation project.

One of the major concerns raised by the BJP leaders was the inflated cost of the project. The Public Works Department (PWD) had initially prepared a preliminary estimate (PE) of Rs. 7.91 crore for the project, based on the Plinth Area Rates published by the Central Public Works Department.

However, the work was eventually awarded at Rs. 8.62 crore, 13.21 per cent higher than the estimate, say sources. Despite this, the final cost reportedly ballooned to Rs 33.66 crore, well beyond the estimated amount.

The report also sheds light on issues with the tendering and consultancy processes, say sources.

The audit reportedly found that the PWD failed to provide sufficient justification for selecting the three consultancy firms that were chosen for restricted bidding. The consultancy work’s cost was based on outdated rates, which were then increased by 50 per cent, according to sources.

Moreover, the selection process for contractors was flagged as arbitrary. Only one of the contractors had the required experience for the job, raising questions about the transparency of the bidding process, say sources.

The CAG also reportedly scrutinised changes made to the scope of the renovation work.

During execution, the built-up area was increased by 36 per cent, from 1,397 sq.m. to 1,905 sq.m.

The report also noted that several items of superior specification, including artistic, antique, and ornamental works, were added to the project.

These additional features contributed to a significant increase in costs. In total, Rs 18.88 crore was spent on executing these high-end items, sources said.

The audit reportedly found that the PWD failed to explore the possibility of tendering for additional work and, instead, continued to award contracts to the existing contractor.

As a result, the final cost escalated further, with some works valued at Rs 25.80 crore being executed without proper approval.

Another major point of contention in the report is the renovations to the Chief Minister’s staff block and camp office. The work, initially estimated at Rs 18.37 crore was awarded at Rs 16.54 crore through restricted tendering.

However, the audit reportedly reveals that funds were diverted from the sanctioned amount for other works.

The staff block was never constructed as per the original plan, and funds were instead used to construct seven servant quarters at a separate location, unrelated to the original work, sources say. The CAG’s report has “raised significant questions about the transparency and financial management of the renovation project”.

–IANS

brt/pgh

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

Advertisment