Railway milestone: 18-coach trial run on Katra-Budgam track in J&K

0
25
<div>Railway milestone: 18-coach trial run on Katra-Budgam track in J&K</div>
Advetisment

Jammu, Jan 19 (IANS) The trial run on the Katra-Budgam railway track of Udhampur-Srinagar-Baramulla Rail Link (USBRL) was completed on Sunday as the 18-coach trial train started at 8 a.m. from Katra railway station towards Kashmir

“The trial 18-coach train has reached Budgam now and this completes the final trial run on the USBRL”, officials of the railway monitoring the trial run said here.

The ambitious USBRL was completed for Rs 41,000 crore. The track covers 326 Km out of which 111 Km section is in tunnels with the T-49 tunnel being 12.77 Km long, which is the longest railway tunnel in the country.

Indian Railways has made the world’s highest railway bridge over the Chenab River in the Reasi district of Jammu and Kashmir.

The iconic Chenab Bridge is 1,315m long having an arch span of 467m and a height of 359m above the river bed. The Chenab Rail Bridge is a steel and concrete arch bridge carrying a single-track railway line, located between Bakkal and Kauri in the Reasi district of Jammu Division.

The bridge spans the Chenab River at a height of 359 m (1,178 ft) above the river, making it the world’s highest rail bridge and the world’s highest arch. It is built between the Sangaldan Railway Station and the Reasi Railway Station.

Indian Railways has also built its first cable-stayed bridge over the Anji Khad. This bridge features a deck 331 meters above the riverbed and a main pylon height of 193 meters. Perched over the Anji Khad river that swells every monsoon season, the bridge is supported by a single pylon, a large vertical tower-like structure soaring 1,086 feet from the river bed similar to the height of a 77-storey building.

Surrounded on both sides by mountain peaks, the construction site is subject to billowing, and gusty winds. The entire USBRL is the most challenging task completed successfully by the Indian Railways. It is probably the most challenging rail link ever built in the world over such a long distance between treacherous mountains, rivers and difficult topography and weather.

The USBRL will boost the horticulture, agriculture, tourism, trade, and education of students and also make travel easy and affordable for the average citizen between Kashmir and the rest of the country.

This project is also one of the most powerful infrastructures integrating J&K with other parts of the country. The Vande Bharat train will chug between Katra and Baramulla the day the inauguration is done by Prime Minister Narendra Modi, the final date of the inauguration is yet to be officially announced.

–IANS

sq/dpb

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

Advertisment