Power supply in rural areas up from 12.5 hours in 2014 to 22.4 hours now: Manohar Lal

0
21
Power supply in rural areas up from 12.5 hours in 2014 to 22.4 hours now: Manohar Lal
Advetisment

New Delhi, Jan 18 (IANS) The power availability in the urban areas has improved from 22 hours to 23.4 hours over the past decade, while in rural areas, it has increased significantly from 12.5 hours to 22.4 hours, Union Power Minister Manohar Lal said on Saturday.

Emphasising the implementation of smart meters installations, the Union Minister said smart meters benefit both consumer and distribution companies by reducing billing errors, enhancing energy efficiency, and providing greater convenience for users — helping DISCOMs in reducing losses, optimisation of power purchase cost and integration of renewable energy, etc.

The minister was speaking at meeting of the Consultative Committee of the Members of Parliament for the Ministry of Power to discuss the “Implementation of Revamped Distribution Sector Scheme (RDSS)”.

Manohar Lal highlighted the necessity to add additional generation and transmission capacities for meeting the ever-growing demand in the country.

The Union Minister also shared that every census village in the country is now electrified, and the aim is now to enhance the quality of services being offered to promote the ease of living for consumers.

The Ministry of Power, in coordination with the Ministry of New and Renewable Energy, has undertaken several measures to alleviate the difficulties consumers faced while installing roof-top solar systems under PM Surya Ghar Muft Bijli Yojana.

These measures include waiving the requirement for Technical Feasibility Study for connections up to 10 kW, implementing deemed load enhancement for RTS installations up to 10 kW, etc.

The minister called upon the state governments to take initiatives to promote rooftop solar schemes for the benefit of consumers.

Shripad Yesso Naik, Minister of State for Power and New and Renewable Energy, highlighted the significant role of the Revamped Distribution Sector Scheme (RDSS) in improving service quality and building consumer trust.

“The effective implementation of projects under RDSS would strengthen the financial sustainability of DISCOMs while ensuring the delivery of reliable and high-quality power to the consumers,” said Naik.

The government launched RDSS with an outlay of Rs 3,03,758 crore with an estimated gross budgetary support (GBS) of Rs 97,631 crore from the Central government.

–IANS

na/

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

Advertisment