HomeTop StoriesIREDA lines up Rs 3,000 crore for green energy projects in Odisha

IREDA lines up Rs 3,000 crore for green energy projects in Odisha

Bhubaneshwar, Dec 23 (IANS) Indian Renewable Energy Development Agency Limited (IREDA) has sanctioned over Rs 3,000 crore for green energy projects across Odisha, covering solar, hydro, ethanol and renewable energy manufacturing sectors, IREDA chairman and managing director Pradip Kumar Das said on Monday.

Addressing the Odisha Solar Investor Conclave, Das reaffirmed IREDA’s commitment to the state’s ambitious renewable energy target, with the state setting its vision on achieving 10 GW capacity by 2030.

Das also spotlighted Odisha’s potential to emerge as a leading solar power producer and a hub for solar equipment manufacturing. Sharing IREDA’s national contributions, he noted that the company has sanctioned over 2.08 lakh crore and disbursed 1.36 lakh crore towards renewable energy projects, positioning itself as a catalyst for market formation in emerging RE technologies such as ethanol, EV fleet financing, pumped storage hydropower and green ammonia.

He emphasized the pivotal role of accessible financing in accelerating renewable energy (RE) projects. IREDA has a unique position as a competitive financier with fully paperless, digitized and borrower-friendly operations, fostering seamless support for green energy projects, he added.

Das reiterated IREDA’s commitment to driving India’s green energy goals, with an envisioned 10-15 per cent contribution to the renewable energy debt financing space.

Meanwhile, India has added nearly 15 GW of renewable energy capacity during April-November in the current financial year, which is almost double the 7.54 GW added during the same period last year, Union Minister Pralhad Joshi said last week.

Addressing the CII International Energy Conference and Exhibition (IECE) here, the Minister for Renewable Energy further stated that India’s total installed capacity in the non-fossil fuel energy sector has reached 214 GW, marking an increase of over 14 per cent compared to the same period last year.

Additionally, he pointed out that 2.3 GW of new capacity was added in November 2024 alone, reflecting a four-fold increase from the 566 MW added in November 2023.

Joshi reiterated the government’s commitment to achieving 500 GW of non-fossil fuel-based capacity by 2030.

–IANS

sps/dpb

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular