HomeTop StoriesIndia's first railway test track for high-speed trials to be operational in...

India’s first railway test track for high-speed trials to be operational in Dec 2025

New Delhi, Nov 10 (IANS) India’s first dedicated railway test track, under construction in Rajasthan, is expected to be completed by December 2025 with a total investment of Rs 820 crore, according to the Ministry of Railways.

The 60-kilometre track will enable advanced testing of rolling stock which includes high-speed trials for bullet trains, and introduce new capabilities in railway infrastructure. Once it becomes operational, the track will accommodate speeds of up to 230 kmph, marking a milestone for high-speed rail testing in India.

Located near Sambhar Lake in the Jodhpur Division, about 80 kilometres from Jaipur, the track runs between Gudha and Thathana Mithdi in the Deedwana district. The new track marks a milestone for Indian Railways, allowing extensive testing without disrupting existing passenger services.

In addition to bullet trains, the track will test high-speed, semi-high-speed, and metro trains in the future. Research Design and Standards Organisation (RSDO) will evaluate every parameter of train performance, including stability and safety on deteriorated tracks before any coach, bogie, or engine is cleared for regular use.

The layout of the track includes numerous curved sections designed for testing train performance at varying speeds. With curves tailored for both low and high-speed tests, the track allows for realistic assessments of how trains respond to sharp turns without reducing speed.

The facility will also test comprehensive safety and durability parameters such as accident resistance, rolling stock stability, and track material quality. RDSO is overseeing the project, which features seven large bridges, 129 small bridges, and four stations – Gudha, Jabdinagar, Nawan, and Mithadi.

The project’s engineering includes Reinforced Cement Concrete (RCC) and steel bridges built to withstand the high-speed vibrations of modern trains. Stainless steel components have been used to prevent corrosion in Sambhar Lake’s alkaline environment, ensuring longevity and safety. This test track will allow India to conduct all train trials domestically, avoiding disruptions to regular rail schedules. It will be available for testing by neighbouring countries, too, showcasing India’s growing expertise in railway infrastructure.

The layout includes a high-speed loop of 13 km at Gudha, a 3 km quick-testing loop at Nawa, and a 20 km curve-testing loop at Meethadi. Additionally, a 7 km twisting track section is being laid to evaluate the train’s response on damaged tracks, aiming to enhance safety protocols for varying rail conditions.

–IANS

sps/svn

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular