HomeTop StoriesComplete development works in Faridabad within timeframe: Haryana Minister

Complete development works in Faridabad within timeframe: Haryana Minister

Chandigarh, Nov 6 (IANS) Haryana Cabinet Minister Vipul Goel, while holding a meeting with officials of the Faridabad Metropolitan Development Authority (FMDA), directed them not to be negligent in work and complete the development works within the timeframe.

After the meeting on Tuesday, he said there should be no quality compromise in development works and action should be taken against the official concerned if the work is not completed on time.

“We aim to take Faridabad further by completing the development works on time and providing maximum facilities to the general public,” he said.

The minister, while instructing the officials to expedite the development works related to roads in the meeting, said daily efficiency should be increased to complete the works so that Faridabad residents do not face inconvenience in commuting.

He said every officer should visit the area concerned to know the persisting problems in order to resolve them. He also reviewed the development works related to multi-level parking.

He directed to make an efficient action plan to deal with the problem of sewerage and water logging due to rain. He said wherever there is a problem of drainage, it should be resolved permanently. He emphasised on having an action plan for using sewerage treatment plant (STP) water for irrigation as much as possible.

Goel said to ensure there is no shortage of drinking water in Faridabad in the future, the officials need to work on the plan from today because water consumption is increasing day by day.

He also directed the officials to provide uniform and uninterrupted supply of drinking water.

Haryana minister thanked Prime Minister Narendra Modi for inaugurating health projects in Faridabad

Last week, PM Modi virtually inaugurated various developmental projects for the Faridabad district.

The list of the projects includes the upgradation of ESI hospital in Faridabad from 650 to 1,150 beds, construction of a new 10-story building, including a basement at the hospital’s premises at a cost of Rs 625 crore, construction of a 15-bed capacity AIIMS CHC in Fatehpur Billoch village and setting up of a centre of excellence on air pollution and health at the AIIMS sub-health centre in Ballabhgarh for research purposes.

–IANS

vg/svn

Go to Source

Disclaimer

The information contained in this website is for general information purposes only. The information is provided by TodayIndia.news and while we endeavour to keep the information up to date and correct, we make no representations or warranties of any kind, express or implied, about the completeness, accuracy, reliability, suitability or availability with respect to the website or the information, products, services, or related graphics contained on the website for any purpose. Any reliance you place on such information is therefore strictly at your own risk.

In no event will we be liable for any loss or damage including without limitation, indirect or consequential loss or damage, or any loss or damage whatsoever arising from loss of data or profits arising out of, or in connection with, the use of this website.

Through this website you are able to link to other websites which are not under the control of TodayIndia.news We have no control over the nature, content and availability of those sites. The inclusion of any links does not necessarily imply a recommendation or endorse the views expressed within them.

Every effort is made to keep the website up and running smoothly. However, TodayIndia.news takes no responsibility for, and will not be liable for, the website being temporarily unavailable due to technical issues beyond our control.

For any legal details or query please visit original source link given with news or click on Go to Source.

Our translation service aims to offer the most accurate translation possible and we rarely experience any issues with news post. However, as the translation is carried out by third part tool there is a possibility for error to cause the occasional inaccuracy. We therefore require you to accept this disclaimer before confirming any translation news with us.

If you are not willing to accept this disclaimer then we recommend reading news post in its original language.

RELATED ARTICLES
- Advertisment -

Most Popular